North Stack - Ready to Button Up

With rough inspections complete and insulation in on the North stack, we're ready to put up the rest of the blueboard, windows and tile board in preparation for tiling.  As the tile installation begins, the contractor will be able to move his crew to the nearby Back stack to begin demo!

2nd Lounge
With blueboard up and new light fixtures installed, 2nd lounge is ready for plastering.  But will we ever be able to match that green? :)


View of window, shower, medicine cabinet and towel holder.
The medicine cabinets will be recessed to take advantage of space in the wall.  To the right is the recessed paper towel holder.

Ceiling fans are roughed in place.
 Fans will be controlled from motion sensor in the fan unit that will ensure we're always pulling moisture from the bathrooms when they are in use.

Storage area, tub, and vanity.
 The exterior walls have been sprayed with closed-cell foam.  This already makes the space feel a good deal more cozy and will help them remain comfortable over the winter.
Tile board ready to receive tile on walls.
 Floors and walls are being tiled for durability.  The ceilings will receive blueboard and plaster.