Monday, September 5, 2016

Ready for Rush

We made it!  With a few hectic weeks of work, we wrapped up the key details and delivered the undergraduates a stunning set of spaces just in time for Rush!  Check out the results!

The 2nd Lounge Fireplace will double as a focal point for presentations.

The 2nd Lounge Bar looks great with its new black marble.

The Dining Room really opens up without the extra bump outs.
The Library is all dressed up with its new trim details, windows, floor and radiators.

The extra height paneling in the Annex really helps to bring out the formality in our reception space.


We'll be back through for punch list items in two weeks, but first, Let the Rush Begin!